Posts

Inland Rail is a multi-billion dollar project aimed at extending the existing inland railway line that currently runs between Melbourne and Parkes, and up to Brisbane.  This will be a combination of existing and new sections of rail.  The idea is to have a north south connection between Brisbane and Melbourne that can shift hundreds of thousands of movement from road to rail freight. This line will need to be upgraded to accommodate double-stacked container trains that are 1.8 km long.

One Nation supports rail transport over road transport, but for this to be effective, the rail service must reflect the needs of the industry. This means trains need to depart according to industry schedules, reliable connections need to be maintained, and fair pricing offered. Inland Rail, in its current form, will provide none of those things. The current alignment (route) in QLD takes the line across the Condamine floodplain, which is, quite frankly, a stupid idea. The deep clay soil in that area cannot support a railway line without horrendously expensive supports, which will then act as a dam during a flood. The Brisbane Port access is constrained, meaning the railway line across Brisbane and into the Port is running close to capacity, with no easy way to extend it.  The Port of Gladstone offers a much better option.  The line can go inland up the Mooney Highway, then through Wandoan to Banana and onwards to Gladstone. This direct, flood-free alignment will provide a cheaper and more reliable transit option.

A new container handling facility is being built in Gladstone, with an intermodal connection to the railway. Gladstone is perfectly positioned to serve as Australia’s gateway port for container traffic from Asia. Best of all, the Port is located away from the city and is strongly supported by local councils. Despite inquiring about this option, it appears the floodplain alignment remains the preferred option. This is not good enough!  One Nation will continue to campaign for Inland Rail to run through to the Port of Gladstone.

Transcript

Senator ROBERTS: Thank you for being here again. I have a number of questions, but I think they’re fairly short and straightforward. Recommendation 1 of the Schott report into the ARTC was to address skills deficiencies in the ARTC. I note that you’ve hired a new chair, Mr Peter Duncan. Has Mr Duncan ever built a railway?  

Mr Johnson: Mr Duncan is the chair of the board. His skills go to requisite skills to be able to lead a board and our organisation. He is certainly familiar with long linear infrastructure, the engineering infrastructure. He’s very familiar with that from his prior roles.  

Senator ROBERTS: What sort of long—  

Mr Johnson: Roads and water. It’s really not a matter for me to comment on the appointment of other directors and Mr Duncan in a role. What I would say is that the board are working really well with myself and holding me to account to make sure we’ve got the requisite skills to operate, maintain and create the network. Further to the recommendations, a key recommendation from Dr Schott’s report and the review was the establishment of the Inland Rail subsidiary and the establishment of the board in parallel. That’s why we sit here today. Nick is the new CEO to Inland Rail. That subsidiary is now fully fledged. They have both a chair and a board in place for the construction of Inland Rail.  

Senator ROBERTS: Thank you. I appreciate and understand the distinctions between governance, management and trusteeship, if you like. He has not built a railway, but he has done other long infrastructure. The other new senior hire is Dr Collette Burke, who is a qualified engineer. Can you confirm her engineering qualification, please?  

Mr Johnson: I know that Collette is an esteemed and qualified engineer, but I don’t have those details in front of me.  

Senator ROBERTS: Could we get it on notice, please?  

Mr Johnson: No problem.  

Senator ROBERTS: There are reports—these may be old—that Dr Burke is also contributing to the Marinus Link from Tasmania to Victoria and Snowy Hydro 2.0. At these still current appointments?  

Mr Johnson: Like all directors, Collette as a director on the board has made clear what other commitments she has and whether are any conflicts at play. I can confirm that is the case.  

Senator ROBERTS: So she is still on the other two boards?  

Mr Johnson: Yes.  

Senator ROBERTS: Minister, has the government made any other appointments to ARTC that address the skills deficiencies identified in the Schott report?  

Senator Carol Brown: I don’t have that information with me, but I can take it on notice.  

Mr Miller: Of course there’s a secondary board now, the subsidiary board of Inland Rail, whose directors all have extensive infrastructure experience.  

Senator ROBERTS: In the earlier discussion on Inland Rail, I asked about what has been called the Goondiwindi to Gladstone alignment. I was advised that this is in the hands of the Queensland government. I find that surprising, when the Commonwealth government is paying for the project. It sounds like the Queensland government is going to decide how the Commonwealth spends the money. The Goondiwindi to Gladstone route is substantially cheaper, and I know there is at least one private partnership trying to get the attention of government with extensive expertise in railroads, freight, construction and shipping. They have money to spend. They’re willing to make a commitment, especially on the Surat Basin link from Moranbah to Banana. I don’t understand why, when the government is juggling budget deficits moving forward, it’s proving so hard to get even a meeting about a public-private partnership happening on this alternative route.  

Mr Johnson: Just to be really clear, there are a few things happening there in parallel. Inland Rail Pty Ltd, headed by Nick, are continuing the work around the design of the route that heads over the Toowoomba range to Ebenezer, and working closely with the National Intermodal company on the connection at Ebenezer. That’s what Inland Rail are focused on. I am aware that there is some early business case development for other alternative options—Goondiwindi or Toowoomba to Gladstone—that the Queensland government have had some insight into.  

Senator ROBERTS: So both Goondiwindi to Gladstone and Toowoomba to Gladstone are being considered as alternative business cases?  

Mr Johnson: I have heard that both are. That’s right. I am acutely aware of the private interest that you’ve mentioned, and we’ve made it clear to the proponent—as we would for anyone who was interested in either developing, adjoining or working around the network, given we’re really the national rail network manager—that, when they get to the point that they’re at an EIS, an environmental impact statement, we’d be happy to support what type of views or impacts that would have, in a practical sense, and suggest what they might consider in that input. We have met, so I’m a little bit lost with the statement that it’s hard to get that meeting.  

Senator ROBERTS: So you’ve already been working with them?  

Mr Johnson: We’ve had a couple of meetings about what we can do at different stages, as they progress their development, to offer them whatever practical support we can, as we would for any other adjoining infrastructure manager.  

Senator ROBERTS: So would you be willing to meet with a private investor who’s willing to fund the railroad construction from Surat Basin, from Moranbah to Banana?  

Mr Johnson: We meet with a number of proponents. That one is a long way from our network, but nationally we’ve met with a number of people who are looking at different things, mostly where it’s connected to our network.  

Senator ROBERTS: How about Inland Rail? Would you be willing to meet the investor to consider this?  

Mr Miller: We’d be willing to meet to assist with indicative pricing that we have experienced per kilometre. It’s outside our scope in terms of our current remit. We’re going from border to Toowoomba and then down to Kagaru, and that’s where our focus is, around the environmental approvals and land acquisition, at present.  

Senator ROBERTS: That’s the vast majority of the cost of Inland Rail—from Toowoomba to Brisbane—as I understand it.  

Mr Miller: It’s a significant part of Inland Rail. It’s not the vast majority.  

Senator ROBERTS: Okay. We can argue about that at another time. Does the ARTC have any other publicprivate partnerships in place for Inland Rail? By ‘private’, I mean actually contributing private funding to the project.  

Mr Johnson: No. The private partnership contract has ceased.  

Senator ROBERTS: Thank you. Does the ARTC have any signed agreements in the Queensland leg of Inland Rail? If so, which?  

Mr Miller: Signed agreements?  

Senator ROBERTS: Yes.  

Mr Miller: With agencies or—  

Senator ROBERTS: Any agreements committing Inland Rail to— 

Mr Miller: Yes, we do. We have multiple land agreements in place. We are well developed with our environmental approvals.  

Senator ROBERTS: That’s for the Toowoomba to Ebenezer route?  

Mr Miller: That’s from the border to Toowoomba—the Gowrie route.  

Senator ROBERTS: Across the Condamine?  

Mr Miller: Across the Condamine. We expect to be in a position to go to public exhibition No. 2 in the last quarter of this year with that EIS approval.  

Senator ROBERTS: What’s the sunk cost of Inland Rail specifically for the Queensland sections? You can do that on notice.  

Mr Miller: I will do that on notice. I can advise the Senate that to date—or to the end of March—we have spent $4.3 billion on the entire program.  

Senator ROBERTS: In Queensland?  

Mr Miller: No, across the entire program.  

Senator ROBERTS: Okay. Could I have the—  

Mr Miller: The sunk cost for Queensland?  

Senator ROBERTS: Yes, please. The rail line from Ebenezer to the port of Brisbane is constrained. The available capacity on that line does not allow for the volume of freight necessary to ever get the construction costs back. The cost of the tunnel down the mountain is without a doubt $20 million, and it won’t be necessary if the rail line terminates in the port of Gladstone. Are they considerations you’re working on in the back of your mind?  

Mr Miller: Our current scope of work is to take double-stack container trains to Ebenezer, and then they are transitioned to single-stack to Kagaru. That’s our scope.  

Senator ROBERTS: Okay. I don’t understand why this economic reality has not been seized upon to reset the planning towards the Goondiwindi to Gladstone route, with freight destined for the airport at Wellcamp coming down from the Miles intermodal to Wellcamp. Are you considering that as part of the alternative?  

Mr Miller: We’re not considering an alternative, but what we are considering is getting the environmental approvals and land acquisition to Toowoomba as a priority, and we’re continuing with the Kagaru section, with three EISs concurrently in that space.  

Senator ROBERTS: You’re aware of the massive concerns about the Condamine crossing?  

Mr Miller: Yes, we are, and we’ve undertaken very significant hydrological studies. Those studies have been to a flood panel and have been accepted as part of the EIS process.  

Senator ROBERTS: What about the foundations for the elevated section of that line, which will be fairly lengthy?  

Mr Miller: Yes, there is going to be an elevated section through the Condamine to improve resilience and reliability during flood periods.  

Senator ROBERTS: Are you aware of the cost?  

Mr Miller: We are working through the costs. The costs will be subject to the conditions that, ultimately, the EIS from the Coordinator-General’s office in Queensland puts upon us, plus the timeline, in terms of when that’s going to be built with inflation and the like, and the design and geotech that’s going on. We’re also doing some embankment trials in that area to ascertain what settlement impacts there will be, and what that means from an engineering perspective, so we can more accurately define the cost and scope.  

Senator ROBERTS: Minister, the outcome of this review by ARTC and the Queensland government of the Queensland leg, in my opinion, must lead to the abandonment of the Condamine floodplain crossing of this railway line; otherwise the railway line won’t be built. That’s my opinion. I’d like to know your feedback on that. What are you getting in the way of reassurance from Inland Rail?  

Senator Carol Brown: We take our advice from the experts.  

Senator ROBERTS: Are they outside Inland Rail or inside?  

Senator Carol Brown: Thank you for your view.  

Senator ROBERTS: Are you getting experts from inside Inland Rail, as well as outside Inland Rail, especially on the Condamine crossing? 

Senator Carol Brown: We get our expert opinions from Inland Rail, as well as our departmental people, but thank you for your view. I’ll pass it on. 

In July 2022, I was successful in having the Senate conduct an inquiry into the ‘Iron Boomerang’ project. This project aims to build steel mills in Abbott Point Townsville and Port Headland, connecting iron ore from the west with coal from Queensland to manufacture Australian steel of superior quality at a more competitive price compared to other steel producers.

World leading steel producers are eager to construct these mills at their own expense, recognising the undeniable financial and quality advantages of the project. Yet, governments have stood in the way of approvals since the project was first raised in the 1980s.

Now for the first time, all relevant governments needed to approve the project are from the same party, removing the political obstacles that have hindered progress so far.

One Nation has been advocating for this project since 2016 and Minister Ayr’s responses to my inquiries today were encouraging. I appreciate the Minister’s comprehensive understanding of the project and wholeheartedly agree with the numerous benefits it offers.

I look forward to this project receiving approval.

Transcript

Senator ROBERTS: Thank you for appearing tonight. Recommendation 2 of the Rural and Regional Affairs and Transport Committee inquiry report into the project known as Iron Boomerang reads: The committee recommends the Australian Government commissions and publishes a scoping study on the establishment of a steel plant/s located in Northern Australia. This relates to the proposal for steel plants at Abbot Point near Townsville and Port Hedland in Western Australia with a railway line or ships being used to exchange iron ore and coal backwards and forwards to make the world’s highest quality steel prices that undercut China by at least 10 per cent. This project will generate hundreds of billions of dollars per year in steel and associated products, many fine by-products, and create tens of thousands of breadwinner jobs. The project proponents have advised they have the funding to build this project from leading infrastructure world funds already. This project does not need public money. The land at Abbot Point is already zoned for a steel mill. Minister, my question is, will you call this inquiry and ensure our future really is made in Australia?  

Senator Ayres: I’m advised that the government is considering its response to this inquiry. I can say further that of course iron ore is one of Australia’s largest commodity exports. We have a very capable mining sector, and we also have adjacent to our mining sector vast solar and wind reserves. The Future Made in Australia agenda is looking at value adding in iron and steel, across a range of our critical mineral categories. It offers very significant opportunities for investment in precisely the kind of industrial capability that you are referring to here. I don’t know anything about the actual proponents of these particular facilities, but in the broad, in metals processing Australia has a significant future comparative advantage. This government wants to make sure that we secure that comparative advantage and that investment, I’m sure.  

Senator ROBERTS: Minister, I’m not sure if you’re aware of it, but this project as it stands will significantly—I don’t believe it’s necessary to reduce carbon dioxide from human activity, but you do and the government does. This project as it stands, with the use of conventional rail, conventional ships, will dramatically reduce the carbon dioxide from human activity because there will be no empty backloading. There will be no oneway transport of coal or iron ore, which are currently exported in massive quantities from this country. Instead, they’ll just be shuffled across the country in a very limited transport regime and back load so that there will always be a load.  

Senator Ayres: Much broader than that is our advantage in solar and wind with 97 per cent of our trading partners, including our trading partners in energy and steel production. Think of markets in Korea and Japan. There are very significant opportunities for Australia in both economic development terms and also, as you point to, in emissions reductions terms, to make a significant contribution to the emissions reductions by our partners by producing onshore in a cleaner way than our trading partners do. This is a very significant national interest question for Australia, and the government is working hard to secure future investments in this area. 

The Albanese government is deliberately opposing my motion to disclose the infrastructure review it’s using to justify slashing hundreds of millions of dollars worth of critical infrastructure projects around Australia. These projects include dams for towns and agriculture, transportation and visionary nation-building projects.  These cuts will impact critical areas where investment is necessary, all while sending substantial funds to the United Nations and Tedros the Terrorist at the WHO. 

Australia requires productive infrastructure to cultivate its competitive and productive edge, reducing its dependence on other nations that purchase our raw materials, like iron ore, for steel and other construction materials. Why should we export raw materials only to buy back finished goods instead of manufacturing the entire product domestically? Australia possesses all the necessary resources to achieve self-reliance, lacking only a government with common sense to facilitate it. 

How many more instances must we uncover before this Labor government reveals the secrets it’s concealing from Australian taxpayers? Australians deserve the transparency and accountability they were promised, and the infrastructure that this country badly needs.

Transcript

The Albanese government is making secret cuts to infrastructure projects. Twice now the Senate has passed my motion, forcing the government to hand over the full infrastructure review that they used to justify cutting hundreds of millions of dollars in projects. Twice, the government has opposed transparency and accountability about its secret infrastructure cuts. How many more times will the Labor government keep secrets from Australian taxpayers? 

This is the Labor review that concluded the Emu Swamp dam at Stanthorpe should be cancelled. Only three years ago, this southern Queensland town was in severe drought and ran dry. They had to cart in millions of litres of water by truck just to survive. Up to 50 trucks carted water hundreds of kilometres every day for 15 months. On what basis did the Labor government conclude Stanthorpe doesn’t deserve a dam? We might never know. The government has so far refused to hand over the review that justifies the decision. If Stanthorpe doesn’t have water, Stanthorpe will die. The Labor government needs to answer why they believe Stanthorpe should be left to die in the next drought. It has literally been hung out to dry. One Nation will keep fighting for those answers and we will fight for more dams across Queensland. What we need in Australia is productive infrastructure to build our competitive advantage—our productive competitiveness. We need dams that agriculture can use to boom. We need cheap power, from which the entire economy will benefit. We need functional roads that don’t have potholes big enough to destroy a car’s suspension. 

Australia needs visionary, nation-building projects—infrastructure projects like the Iron Boomerang. Right now, every year, we send 900 million tonnes of iron ore and 360 million tonnes of coal overseas. We ship it overseas. Those are two essential ingredients to making steel, which we largely import. We put that dirt on a boat, places like China buy it, they turn it into steel, they make things like unproductive wind turbines out of the steel, they put them on a boat and they ship the wind turbines back to Australia in the form of steel, where our dopey government buys it off them. 

We should let private enterprise build the Iron Boomerang track linking our iron ore and coalmines, so we can make the steel right here in this country. The government doesn’t even have to build Iron Boomerang. They just have to promise they won’t get in the way, and then private money will pay for it. That money is already knocking on the door. These are the kinds of nation-building infrastructure projects that would be on the horizon if One Nation had our way. We certainly wouldn’t be cutting productive infrastructure, like dams, in secret as the Labor government is doing. Before all of that we need accountable and transparent government. Labor continues to prove it will never be transparent. Their secret infrastructure cuts are just the latest example of a government that’s afraid of explaining itself to the voters.  

The Albanese government is deliberately opposing my motion to reveal the infrastructure review it’s using to justify cutting hundreds of millions of dollars worth of badly needed infrastructure projects around Australia. Projects like dams for towns and agriculture, transport projects and visionary nation-building projects. It’s cutting costs in areas where we need to spend, while sending huge sums to the United Nations and Tedros the Terrorist at the WHO.

Australia needs a productive infrastructure so that we can build our competitive and productive advantage and stop relying on other nations who buy our raw materials such as iron ore, for example, for steel and other building materials. Why are we exporting raw materials and buying back finished products instead of making the whole product here? Australia has everything it needs to be self-reliant, except for a government with the common sense to facilitate it.

How many more times will this Labor government be exposed for the secrets its hiding from the Australian taxpayers?

Australians deserve the transparency and accountability they were promised, and the infrastructure this country badly needs.

Transcript

The Albanese government is making secret cuts to infrastructure projects. Twice now the Senate has passed my motion, forcing the government to hand over the full infrastructure review that they used to justify cutting hundreds of millions of dollars in projects. Twice, the government has opposed transparency and accountability about its secret infrastructure cuts. How many more times will the Labor government keep secrets from Australian taxpayers? 

This is the Labor review that concluded the Emu Swamp dam at Stanthorpe should be cancelled. Only three years ago, this southern Queensland town was in severe drought and ran dry. They had to cart in millions of litres of water by truck just to survive. Up to 50 trucks carted water hundreds of kilometres every day for 15 months. On what basis did the Labor government conclude Stanthorpe doesn’t deserve a dam? We might never know. The government has so far refused to hand over the review that justifies the decision. If Stanthorpe doesn’t have water, Stanthorpe will die. The Labor government needs to answer why they believe Stanthorpe should be left to die in the next drought. It has literally been hung out to dry. One Nation will keep fighting for those answers and we will fight for more dams across Queensland. What we need in Australia is productive infrastructure to build our competitive advantage—our productive competitiveness. We need dams that agriculture can use to boom. We need cheap power, from which the entire economy will benefit. We need functional roads that don’t have potholes big enough to destroy a car’s suspension. 

Australia needs visionary, nation-building projects—infrastructure projects like the Iron Boomerang. Right now, every year, we send 900 million tonnes of iron ore and 360 million tonnes of coal overseas. We ship it overseas. Those are two essential ingredients to making steel, which we largely import. We put that dirt on a boat, places like China buy it, they turn it into steel, they make things like unproductive wind turbines out of the steel, they put them on a boat and they ship the wind turbines back to Australia in the form of steel, where our dopey government buys it off them. 

We should let private enterprise build the Iron Boomerang track linking our iron ore and coalmines, so we can make the steel right here in this country. The government doesn’t even have to build Iron Boomerang. They just have to promise they won’t get in the way, and then private money will pay for it. That money is already knocking on the door. These are the kinds of nation-building infrastructure projects that would be on the horizon if One Nation had our way. We certainly wouldn’t be cutting productive infrastructure, like dams, in secret as the Labor government is doing. Before all of that we need accountable and transparent government. Labor continues to prove it will never be transparent. Their secret infrastructure cuts are just the latest example of a government that’s afraid of explaining itself to the voters.  

Treasurer Jim Chalmer plans to cut infrastructure spending at a time when Australia needs to increase its productive capacity.

I make the point that by investing in productive capacity, Australia can increase its productivity and avoid the supply chain shortages which drive up prices of goods.

If the Treasurer is hunting for spending cuts, he need look no further than the federal and state subsidies amounting to $10 billion per quarter. That’s $4 billion more than before COVID.

One Nation knows how to fight inflation. Cut immigration, ditch the UN Net Zero pipe dream, build productive capacity and infrastructure, and stop creating inflation in the first place. The Reserve Bank printed $500 billion out of thin air in response to COVID and now we are seeing the consequences.

Australia does best as a productive nation. Let’s get back to basics and allow Australians to prosper.

Transaction

The coalition is correct to point out the lunacy of Treasurer Jim Chalmers’s comments that he may cut infrastructure funding to fight inflation. The best way to fix inflation is to increase productivity, including through productive infrastructure and productive capacity. In fact, the best way to fix inflation is to make sure it doesn’t happen in the first place. That means stopping the Reserve Bank from creating $500 billion out of thin air and dropping it from helicopters as they did for Scott Morrison in the response to COVID. Never again. That means stopping the record level of net immigration, estimated at 500,000 this year—half a million! That means pulling back on the 2.3 million visa holders in the country right now who are adding pressure to the housing crisis, driving up demand, driving rentals up and driving inflation. 

To the Treasurer, if you’re looking for spending cuts to fight inflation, look at subsidies. Australian federal and state governments are still handing out $10 billion in subsidies per quarter—$4 billion more than before COVID. Treasurer, if you really want to cut some infrastructure to fight inflation, cut any money you are putting toward wind, solar, batteries and pumped hydro, like Snowy 2.0. That’s the dog in New South Wales, by the way. That will have a double positive effect, taking the heat out of house construction prices and dropping power prices, which contribute to almost every other product in the country. 

Let’s get serious about fighting inflation. Here’s how you do it: cut immigration; ditch the United Nations net zero pipe dream; build productive capacity and productive infrastructure, like ports, dams, railways and power stations; and don’t create inflation in the first place, printing money out of thin air in electronic journal entries as the Reserve Bank has admitted. Get back to sound basics that enable the productive capacity of Australians to prosper.